Source-backed inputs
NASA/JPL FactPlanetary semi-major axes, orbital mechanics concepts, solar irradiance decay factors (e.g. 1/r²), orbit baselines, and published launcher payload specs cited from NASA/JPL fact sheets and official vehicle guides.
MISSIONFORGE
Design · Simulate · Explore
Guide & Documentation
An Earth-origin solar-system expedition game. Historical spacecraft and NASA discoveries ground each voyage; custom performance, payload values, and mission outcomes are explicit gameplay models.
Destination
Depart from Earth for one body per voyage: the Moon, any of the seven other planets, or a solar flyby.
Spacecraft
Review a real flown mission to that target, then assemble a fictional game bus and power architecture.
Payload
Select instruments, a relay, or a rover. Payload capability and resource demands affect what the mission can return.
Launch vehicle
Compare the stack with destination-specific launcher capacity and budget assumptions.
Mission profile
Select flyby, orbit, probe, or surface encounter where appropriate, then choose a simplified transfer scenario.
Flight operations
Jump between departure, cruise, approach, and arrival events. Read a NASA research briefing, then make two operations decisions.
NASA Reference Framing
MISSIONFORGE’s six-phase workflow provides an educational walkthrough alongside the four mission segments described in NASA’s Design and Develop Science Missions:
Separate maturity framework: NASA JPL’s Concept Maturity Levels (CMLs) is an independent framework for maturing early mission concepts (CML 1–4); it is separate from and does not validate MISSIONFORGE’s custom 0–100 game readiness score.
Scientific Methodology
MISSIONFORGE combines published empirical reference data from NASA, JPL, and commercial launch providers with simplified gameplay assumptions. The model evaluates your mission deterministically: identical inputs produce identical evaluations every time.
Source-backed inputs
NASA/JPL FactPlanetary semi-major axes, orbital mechanics concepts, solar irradiance decay factors (e.g. 1/r²), orbit baselines, and published launcher payload specs cited from NASA/JPL fact sheets and official vehicle guides.
Scenario assumptions
Game AssumptionProgram budgets, most launch capacity away from the published LEO/Mars reference cases, the compressed 210-day Mars transit, travel time outside historical references, trajectory multipliers, fictional spacecraft bus power draws, and developmental reliability formulas designed to illustrate engineering trade-offs.
Calculated results
Calculated ResultPayload mass margins, power margins, cost margins, composite readiness scores, and PASS/FAIL constraint evaluations derived from deterministic domain equations.
Educational Simulator Notice: MISSIONFORGE is an educational model designed for learning and exploration. It is not flight software and does not predict the actual operational outcome of a real spaceflight.
Source Inventory
54 audited model parameters
| Parameter & Subsystem | Model Value & Units | Classification | Source & Citation |
|---|---|---|---|
Perseverance Mars-arrival research reference Destination | 203days launch-to-landing (historical reference) | NASA/JPL Fact | NASA Mars 2020 Perseverance mission(accessed 2026-11-14) Specific historical cruise; the separate 210-day Mission Forge baseline is a game assumption. |
Apollo 8 lunar-orbit timeline Destination | 3days launch-to-lunar-orbit (historical reference) | NASA/JPL Fact | NASA Apollo 8 mission(accessed 2026-11-14) Historical crewed mission timeline; other lunar trajectories differ. |
MESSENGER Mercury-orbit timeline Destination | 2,418 (~6.6 yr)days launch-to-orbit (historical reference) | NASA/JPL Fact | NASA MESSENGER mission(accessed 2026-11-14) Launched Aug. 3, 2004 and entered Mercury orbit March 18, 2011 using Earth, Venus, and Mercury gravity assists; not a universal Mercury travel time. |
Mercury Solar Irradiance Factor Destination | 6.67factor (relative to 1 AU) | NASA/JPL Fact | NASA Mercury Fact Sheet (Inverse-Square Law)(accessed 2026-11-14) Mercury orbits at a mean distance of 0.387 AU (~57.9 million km); inverse-square solar flux is 1 / (0.387)² ≈ 6.67× Earth (~9,083 W/m²). |
Magellan Venus-arrival timeline Destination | 463days launch-to-arrival (historical reference) | NASA/JPL Fact | NASA Magellan mission(accessed 2026-11-14) Magellan launched May 4, 1989 and arrived Aug. 10, 1990. |
Juno Jupiter-arrival timeline Destination | 1,795 (~4.9 yr)days launch-to-orbit (historical reference) | NASA/JPL Fact | NASA Juno mission(accessed 2026-11-14) Launched Aug. 5, 2011 and entered Jupiter orbit July 4, 2016 (including a 2013 Earth gravity assist); trajectory and assists affect duration. |
Cassini Saturn-arrival timeline Destination | 2,451 (~6.7 yr)days launch-to-orbit (historical reference) | NASA/JPL Fact | NASA Cassini mission(accessed 2026-11-14) Cassini launched Oct. 15, 1997 and entered Saturn orbit July 1, 2004 via Venus, Earth, and Jupiter gravity assists. |
Cassini Peak Heliocentric Speed Destination | 44km/s (relative to the Sun during 1999 Earth flyby) | NASA/JPL Fact | NASA Cassini Mission FAQ(accessed 2026-11-14) Maximum heliocentric speed recorded during the Aug. 18, 1999 Earth flyby; not a representative cruise speed. |
Voyager 2 Uranus flyby timeline Destination | 3,079 (~8.4 yr)days launch-to-flyby (historical reference) | NASA/JPL Fact | NASA Uranus exploration(accessed 2026-11-14) Launched Aug. 20, 1977 and flew by Uranus Jan. 24, 1986; Voyager 2 remains the only spacecraft to make a close Uranus visit. |
Voyager 2 Neptune flyby timeline Destination | 4,388 (~12.0 yr)days launch-to-flyby (historical reference) | NASA/JPL Fact | NASA Neptune exploration(accessed 2026-11-14) Launched Aug. 20, 1977 and flew by Neptune Aug. 25, 1989; Voyager 2 made the only close Neptune flyby to date. |
Parker Solar Probe perihelion speed Destination | ~190km/s relative to the Sun near perihelion | NASA/JPL Fact | NASA Parker Solar Probe(accessed 2026-11-14) Approximate heliocentric peak speed (~430,000 mph) near closest solar approach; speed varies continuously along its orbit and is not a cruise speed or direct trip to a surface. |
Solar Encounter Scenario Duration Destination | 1,500days | Game Assumption | MISSIONFORGE Solar Scenario Baseline Parker Solar Probe uses repeated Venus gravity-assist orbits over a multi-year mission rather than a single one-way transfer; 1,500 days is a simplified game scenario duration. |
LEO Orbit Altitude Destination | 400km | NASA/JPL Fact | NASA International Space Station Reference Orbit(accessed 2026-10-11) Nominal circular orbital altitude for the ISS (~400 km above Earth mean sea level). |
LEO Solar Irradiance Factor Destination | 1.0factor (relative to 1 AU) | NASA/JPL Fact | NASA Solar Physics Baseline(accessed 2026-10-11) Standard solar constant at 1 Astronomical Unit (~1,361 W/m² baseline). |
LEO Scenario Budget Destination | 800$M (USD) | Game Assumption | MISSIONFORGE Scenario Baseline Gameplay budget cap for small Earth-orbiting science missions. |
Moon Mean Distance Destination | 384,400km | NASA/JPL Fact | NASA Moon Fact Sheet(accessed 2026-10-11) Average distance from the center of Earth to the center of the Moon (384,400 km). |
Moon Solar Irradiance Factor Destination | 1.0factor (relative to 1 AU) | NASA/JPL Fact | NASA Moon Fact Sheet(accessed 2026-10-11) The Moon orbits Earth at approximately 1 AU from the Sun, receiving equivalent mean solar flux. |
Moon Transit Time (TLI) Destination | 5days | NASA/JPL Fact | NASA Artemis 1 Flight Profile(accessed 2026-10-11) Representative trans-lunar coast duration. Artemis I took ~5–6 days from TLI to lunar flyby (Nov 16–21, 2022); Apollo missions used higher-energy direct trajectories of ~3 days. The model value of 5 days falls within the realistic TLI range. |
Moon Scenario Budget Destination | 1,600$M (USD) | Game Assumption | MISSIONFORGE Scenario Baseline Gameplay budget cap for lunar exploration missions. |
Mars Semi-Major Axis Destination | 1.524AU | NASA/JPL Fact | NASA Mars Fact Sheet(accessed 2026-10-11) Mean orbital distance of Mars from the Sun in Astronomical Units (227.9 million km). |
Mars Solar Irradiance Factor Destination | 0.43factor (relative to 1 AU) | NASA/JPL Fact | NASA Mars Fact Sheet (Inverse-Square Law)(accessed 2026-10-11) Sunlight intensity scales inversely with distance squared: 1 / (1.524)² ≈ 0.430 (~586 W/m²). |
Mars Distance Approximation Destination | 225,000,000km | Game Assumption | MISSIONFORGE Midpoint Approximation(accessed 2026-10-11) A Mission Forge approximation, not a NASA mean. NASA's Mars Fact Sheet specifies a minimum distance of 54.6 million km, maximum of 401.4 million km, and mean-at-opposition of 78.34 million km. |
Mars Transit Time (Model Baseline) Destination | 210days | Game Assumption | MISSIONFORGE Gameplay Baseline Mission Forge gameplay baseline, not a sourced Hohmann minimum. The textbook minimum-energy Hohmann transfer from Earth to Mars is ~259 days (NASA Basics of Space Flight, Ch. 4); real optimal-window trajectories vary. The 210-day figure is a compressed game value used for pacing. Gameplay value unchanged. |
Mars Scenario Budget Destination | 2,500$M (USD) | Game Assumption | MISSIONFORGE Scenario Baseline Gameplay budget cap for flagship deep-space science missions. |
Falcon 9 LEO Payload Launch Vehicle | 22,800kg | Published Operator Spec | SpaceX Falcon 9 User's Guide(accessed 2026-10-11) Published maximum theoretical capability to Low Earth Orbit in expendable mode. |
Falcon 9 Mars Payload Launch Vehicle | 4,020kg | Published Operator Spec | SpaceX Official Vehicle Specification(accessed 2026-10-11) Published capability to trans-Mars injection. |
Falcon 9 Legacy Model Cost ($67M) Launch Vehicle | 67$M (USD) | Game Assumption | Legacy List Price / Model Baseline(accessed 2026-10-11) Legacy list price preserved for gameplay balance. SpaceX's current published Capabilities & Services document lists $74M through 2026, so $67M represents a simplified legacy game value rather than SpaceX's current published price. |
SLS Block 1 LEO Payload Launch Vehicle | 95,000kg | NASA/JPL Fact | NASA Space Launch System Reference Guide(accessed 2026-10-11) NASA published exploration lift capability to LEO. |
SLS Block 1 Lunar Injection / Mars Model Value Launch Vehicle | 27,000kg | Game Assumption | NASA SLS Fact Sheet (TLI Rating) / Model Heuristic(accessed 2026-10-11) In NASA technical documentation, 27,000 kg refers to lunar/TLI capability, not Mars payload capacity. The simulation model's use of this figure as deep-space payload capacity for Mars is a game assumption. |
SLS Illustrative Planning Cost Launch Vehicle | 2,700$M (USD) | Game Assumption | NASA OIG / GAO Cost Audit Reports(accessed 2026-10-11) Illustrative production and operations planning estimate; NASA does not offer SLS on a fixed commercial price schedule. |
Ariane 6 (A64) LEO Payload Launch Vehicle | 21,650kg | Published Operator Spec | ESA / Arianespace Ariane 6 User's Manual(accessed 2026-10-11) Four-booster configuration payload to Low Earth Orbit. |
Ariane 6 Mars Escape Payload Launch Vehicle | 5,200kg | Published Operator Spec | ESA Institutional Launch Documentation(accessed 2026-10-11) High-energy escape trajectory capability for European science missions. |
Ariane 6 Published Contract Cost Launch Vehicle | 82$M (USD) | Published Operator Spec | ESA Institutional Procurement Target(accessed 2026-10-11) Published target launch service contract price for ESA institutional missions. |
Starship LEO Target Capacity Launch Vehicle | 150,000kg | Published Operator Spec | SpaceX Starship Capability Targets(accessed 2026-10-11) Target reusable payload capacity to orbit. |
Starship Refilled Mars Capacity Launch Vehicle | 100,000kg | Published Operator Spec | SpaceX Starship Capability Targets(accessed 2026-10-11) Target deep-space payload requiring orbital propellant refilling tankers. |
Starship Planning Cost Estimate Launch Vehicle | 100$M (USD) | Game Assumption | MISSIONFORGE Scenario Baseline Hypothetical scenario estimate; SpaceX has not published a commercial contract price or per-flight price schedule. |
Lunar Capacity Heuristic (35% of LEO) Launch Vehicle | 0.35fraction of LEO payload | Game Assumption | Generic Delta-V Rule of Thumb Simplified approximation used for Moon missions across all launchers without specific TLI curves. |
Deep-Space Delivery Proxy (Mars TMI Rating) Launch Vehicle | Mars payload ratingkg (reused beyond Mars) | Game Assumption | MISSIONFORGE Deep-Space Delivery Proxy For Mercury, Venus, Jupiter, Saturn, Uranus, Neptune, and Sun scenarios, Mission Forge reuses each launcher's Mars payload figure as a simplified delivery proxy rather than computing target-specific C3 launch curves. |
Spacecraft Bus Mass, Cost & Power Spacecraft Bus | Vanguard (900 kg / 2500 W / $250M), Pathfinder (1800 kg / 5000 W / $450M), Aurora (2600 kg / 3000 W / $900M)kg, W, $M | Game Assumption | MISSIONFORGE Design Archetypes Fictional hardware archetypes designed to illustrate flyby, orbiter, and lander trade-offs. |
Payload Mass & Power Demands Payload | Science (600 kg / 300 W), Relay (1200 kg / 800 W), Rover (1900 kg / 100 W)kg, W, $M | Game Assumption | MISSIONFORGE Scientific Payloads Modeled loosely on NASA instruments (e.g. MRO, Perseverance) but calibrated as gameplay trade-offs. |
Radioisotope Thermoelectric Generator (RTG) Power System | 300W (electrical) | Game Assumption | NASA Radioisotope Power Systems Program(accessed 2026-10-11) Calibrated to real multi-hundred-watt RTG systems; provides invariant output independent of solar distance. |
Space Surface Fission Power Concept Power System | 10,000W (10 kWe) | Game Assumption | NASA Kilopower / KRUSTY Demonstration(accessed 2026-10-11) Modeled on NASA's 1-10 kWe Kilopower space reactor development project; conceptual, carries developmental risk penalty. |
Hohmann Transfer Concept Trajectory | Minimum-Energy Coplanar Elliptical Transferorbital mechanics concept | NASA/JPL Fact | NASA Basics of Space Flight: Chapter 4(accessed 2026-10-11) NASA description of standard minimum-energy transfer orbits connecting two coplanar circular orbits using two engine impulses. |
Hohmann Transfer Multipliers Trajectory | 1.0 mass / 1.0 transit / 1.0 riskmultipliers | Game Assumption | MISSIONFORGE Baseline Parameters Baseline normalization factors for the game model; not empirical NASA flight multipliers. |
Fast / High-Energy Transfer Concept Trajectory | Hyperbolic / High-Energy Direct Injectionorbital mechanics concept | NASA/JPL Fact | NASA Basics of Space Flight: Chapter 4(accessed 2026-10-11) NASA description of high-energy transfer trajectories trading excess delta-v to shorten flight duration. |
Fast Transfer Multipliers Trajectory | 1.2 mass / 0.7 transit / 0.99 riskmultipliers | Game Assumption | MISSIONFORGE Scenario Multipliers Mission Forge gameplay trade-off multipliers trading 20% payload mass penalty for ~30% transit reduction; not NASA facts. |
Gravity Assist Trajectory Concept Trajectory | Planetary Flyby Momentum Transferorbital mechanics concept | NASA/JPL Fact | NASA Basics of Space Flight: Chapter 4(accessed 2026-10-11) NASA description of momentum and energy transfer from planetary flybys (as flown on Voyager, Galileo, Cassini, and New Horizons). |
Gravity Assist Multipliers Trajectory | 0.85 mass / 1.4 transit / 0.97 riskmultipliers | Game Assumption | MISSIONFORGE Scenario Multipliers Mission Forge gameplay trade-off numbers balancing mass capacity savings against longer transit and complexity penalties; not NASA facts. |
Earth–Mars Geometric Range Snapshot Trajectory | 13 monthly range samples from 2026-11-14 through 2027-11-09km | NASA/JPL Fact | JPL Horizons API — Mars relative to Earth body center(accessed 2026-11-14) Snapshot request: target Mars (499), center 500@399, VECTORS table 6, KM-D units, 30-day output step. The geometric range (RG) is planetary separation at each sample epoch; it is not a launch-window, transfer-trajectory, or mission-success prediction. |
Estimated One-way Light Time (Planetary Range) Evaluation Metric | Earth–Mars range / 299,792.458 km/sminutes | Calculated Result | JPL Horizons range and exact speed of light (NIST CODATA)(accessed 2026-11-14) Estimated light time derived by dividing the cached Horizons Earth–Mars center-to-center geometric range by the speed of light in vacuum. Round-trip time is twice this estimate; this is not an exact spacecraft communication prediction, and in-game wait/coverage rules are simplified gameplay. |
Mission Operations Checkpoint Effects Evaluation Metric | Observation coverage, power-margin deltas, and communications-window statescenario units / percentage points | Game Assumption | MISSIONFORGE Mission Operations Scenario Authored deterministic game effects. The ground-confirmation choice loses one modeled observation slot per 15 minutes of round-trip light time; observation coverage thresholds and power-margin deltas are gameplay rules, not empirical flight-performance values. |
Mass Margin Calculation Evaluation Metric | Launcher Capacity - Stack Mass × Profile Factorkg | Calculated Result | Deterministic Physics Balance Hard constraint requires mass margin ≥ 0 kg; soft margin warns if under 10% of total launcher capacity. |
Power Margin Calculation Evaluation Metric | Available Power - (Bus Power + Payload Draw)W | Calculated Result | Deterministic Subsystem Balance Hard constraint requires power margin ≥ 0 W; soft margin warns if under 10% of total electrical demand. |
Composite Mission Readiness Evaluation Metric | Weighted 0–100 Multi-Attribute Utility Scorepoints (0–100) | Calculated Result | Deterministic Scoring Algorithm Synthesizes mass reserve (25%), power reserve (20%), budget margin (15%), modeled reliability (30%), and science yield (10%) with complexity risk deductions. |
Transparency & Source Audit
The following values currently use planning estimates, heuristics, or generic rules of thumb rather than binding commercial flight contracts or peer-reviewed primary telemetry:
Parker Solar Probe uses repeated Venus gravity-assist orbits over a multi-year mission rather than a single one-way transfer; 1,500 days is a simplified game scenario duration.
Mission Forge gameplay baseline, not a sourced Hohmann minimum. The textbook minimum-energy Hohmann transfer from Earth to Mars is ~259 days (NASA Basics of Space Flight, Ch. 4); real optimal-window trajectories vary. The 210-day figure is a compressed game value used for pacing. Gameplay value unchanged.
Legacy list price preserved for gameplay balance. SpaceX's current published Capabilities & Services document lists $74M through 2026, so $67M represents a simplified legacy game value rather than SpaceX's current published price.
In NASA technical documentation, 27,000 kg refers to lunar/TLI capability, not Mars payload capacity. The simulation model's use of this figure as deep-space payload capacity for Mars is a game assumption.
Illustrative production and operations planning estimate; NASA does not offer SLS on a fixed commercial price schedule.
Hypothetical scenario estimate; SpaceX has not published a commercial contract price or per-flight price schedule.
Simplified approximation used for Moon missions across all launchers without specific TLI curves.
For Mercury, Venus, Jupiter, Saturn, Uranus, Neptune, and Sun scenarios, Mission Forge reuses each launcher's Mars payload figure as a simplified delivery proxy rather than computing target-specific C3 launch curves.
Fictional hardware archetypes designed to illustrate flyby, orbiter, and lander trade-offs.
Modeled loosely on NASA instruments (e.g. MRO, Perseverance) but calibrated as gameplay trade-offs.
Baseline normalization factors for the game model; not empirical NASA flight multipliers.
Mission Forge gameplay trade-off multipliers trading 20% payload mass penalty for ~30% transit reduction; not NASA facts.
Mission Forge gameplay trade-off numbers balancing mass capacity savings against longer transit and complexity penalties; not NASA facts.
Authored deterministic game effects. The ground-confirmation choice loses one modeled observation slot per 15 minutes of round-trip light time; observation coverage thresholds and power-margin deltas are gameplay rules, not empirical flight-performance values.